Camp Polk Restoration Details
Details on the major restoration of Whychus Creek at Camp Polk Meadow Preserve.
The restoration of Whychus Creek through Camp Polk Meadow Preserve has begun! During this multi-year restoration project, the Land Trust, in partnership with the Upper Deschutes Watershed Council and Deschutes National Forest, will work to restore the creek to its historic channel.
Learn more about the project:
- Watch a slideshow overview of the project.
- Watch documentaries on the restoration.
- Watch the time-lapse videos that capture the construction phase.
- Watch a recap slideshow of the construction phase (May 25-July 10, 2009).
Major events for 2010:
- Monitoring of the newly constructed channel and its associated vegetation.
- Spring plantings of more than 10,000 new plants around the channel.
- Weed management.
Maps below show the restoration work in detail. And more information about the goals of the restoration can be found below. Be sure to join us for an on the ground restoration tour this spring, summer and fall.
Map 1: Entire meadow restoration view
This map shows the restoration plan for the entire meadow. The meadow is broken into several reaches (yellow numbers) to plan and implement the restoration. (Click on the map for a larger image.)
Map 2: Restoration reach 2
This map shows the plan for reach 2 where the restored creek will enter meadow. (Click for larger image.)
Map 3: Restoration reach 3
This map shows the plan for reach 3. (Click for larger image.)
Major goals of the restoration:
1. Improve habitat for redband trout, chinook and steelhead. The restored stream channel will have
- more meanders to increase overall channel length, slower water flow, and improve habitat.
- more pools will provide deep water for fish to us as refuge.
- more riffles and glides to increase habitat diversity.
- more logs to provide cover for fish and help slow flood waters.
2. Restore the wet meadow.
- improve wildlife and plant habitat by creating more wetland and streamside pland communities.
- store groundwater to help recharge the stream during low-flow periods and provide cooler water for fish during warmer months.
- increase flood-prone area so the creek can access its floodplain as it naturally would.
3. Provide for natural channel stability. The new channel will meet reference conditions for channel pattern (e.g., sinuosity, meander length), dimension (e.g., width, depth) and profile (e.g., gradient). These reference metrics are used to develop the channel design so it closely mimics what occured prior to human disturbance.
For more details on the restoration, please download the restoration plan. Or feel free to contact the Land Trust with questions or concerns.